Daily Maintenance Overview
26 May 2026 · Shift A (06:00–14:00) · Production Floor 2 · Lines A–D
Task Completion Rate
Shift A · 26 May 2026
OEE Score
94.2%
Avail.
83.1%
Perf.
97.8%
Qual.
World class target: ≥85%
Equipment Availability
7 of 8 machines running
Defects & Abnormalities
4 Critical · 6 Major · 4 Minor
Maintenance Compliance
Target: 95% · Gap: 7.5pp
Overdue & Pending Tasks
3 critical tasks past SLA — immediate escalation required
Maintenance Tasks — Shift A
10 tasks · All Tasks
Showing 10 of 10 tasks
Shift Summary
26 May 2026 · All shifts
79%
Compl.
87%
Comply.
14
Defects
7
Overdue
Shift starts at 14:00
96%
Compl.
94%
Comply.
6
Defects
1
Overdue
Live Activity
Last 2 hoursM. Sharma logged Critical defect on LA-1 — bearing noise
R. Verma completed Fastener Torque Check on LB-1
Belt Tension Inspection on LB-2 — 3h 15m past SLA
A. Pillai logged 3 abnormalities on LA-2 — vibration spike
K. Menon completed Filter Replacement on LD-1
Equipment Health Monitor
All 8 machines · OEE, availability, and task status
CNC Lathe A1
Line A
96.1%
Avail
85.3%
Perf
99.2%
Qual
Last inspection: 07:30
CNC Lathe A2
Line A
78.2%
Avail
81.5%
Perf
98.6%
Qual
Last inspection: 09:30
Press B1
Line B
98.4%
Avail
92.7%
Perf
99.8%
Qual
Last inspection: 10:00
Press B2
Line B
71.4%
Avail
79.3%
Perf
97.2%
Qual
Last inspection: 08:00
Milling C1
Line C
90.5%
Avail
84.2%
Perf
98.9%
Qual
Last inspection: 08:30
Milling C2
Line C
93.7%
Avail
85.1%
Perf
99.1%
Qual
Last inspection: 10:30
Grinder D1
Line D
95.8%
Avail
91.4%
Perf
99.5%
Qual
Last inspection: 09:00
Grinder D2
Line D
85.6%
Avail
80.7%
Perf
98.4%
Qual
Last inspection: 11:00